Can a permit be phased during the construction stage?

Yes, a permit can be phased. A phasing plan must be submitted to the Fire Marshal’s Office during the online permitting process.

Show All Answers

1. Do I need to register my Fire Alarm or Medical Alarm?
2. Plan Reviews?
3. Fire Inspections?
4. Is there an Arson Hot Line?
5. How do I report a complaint about a fire hazard?
6. How do I request a Fire Station Visit or have a Fire Truck Visit my special event, daycare, or school?
7. How can I find out about Fire Safety programs available through Mesquite Fire Department?
8. Smoke Detectors?
9. What is the best kind of fire extinguisher for my house?
10. What version of the International Fire Code has the City of Mesquite adopted?
11. What systems or items are required to have a permit from the Mesquite Fire Department?
12. How do I apply for a Fire Department permit?
13. What is the cost for a permit?
14. Can work begin before a permit is issued by the Fire Department?
15. What is the Fire Department turnaround time on permits?
16. Does the Fire Department have a fast track system for permits?
17. Can a permit be phased during the construction stage?
18. How do I request a fire protection system inspection?
19. Can a general contractor call for a fire inspection for a system test?
20. Can a fire protection system test be scheduled on the same day?
21. Can a fire protection system test be scheduled after hours?
22. Can a contractor go vertical with the building before the fire lane is installed or before the fire hydrants have been tested and approved?
23. Can combustibles be placed on the property before the fire lane is installed or before the fire hydrants have been tested and approved?
24. Can a building be occupied before the fire protection systems are tested and approved?
25. Can stock or merchandise be placed in the building before the fire protection systems are tested and approved?
26. When is a fire alarm operational permit required?
27. What is the cost of a fire alarm operational permit?
28. When is a Knox-Box (key box) required?
29. Where can I obtain a Knox-Box application?
30. Where should the Knox-Box be placed?